News Alert: Land and water defenders are opposing the creation of a dam across the Zambezi River. They are requesting support to highlight concerns. We encourage you to comment on the Environmental and Social Impact Assessment (ESIA) before it closes on January 25th. The Zambezi River Authority needs to capture grievances for their Responses Report for the ESIA.
The Environmental Resources Management (ERM) is in receipt of a report from a stakeholder. They have collated feedback from other stakeholders living in the Project Area of Influence in Zambia and Zimbabwe. Reports from community members living in the Project Area of Influence, have noted, that people are nervous to speak out against the BGHES Project, or even raise concerns and ask questions.
There is a strong feeling that in Zambia, largely due to historical context, that people cannot speak out against what the government is saying or doing for fear of retribution. Such retribution may be subtle or non-violent, such as having your livelihood taken away, rather than open threats/ acts of violence.
Batoka Gorge Hydro Electric Scheme (BGHES)
The proposed BGHES Project is seen as government driven and, therefore, people are not willing to question it. There is not a culture of speaking out against government, as such, people who may be opposed to the BGHES might not voice their opinion for fear of the consequences.
It has been reported that there have been threats of violence against people living in the Project Area of Influence who have opposed or questioned the BGHES Project.
There is no written documentation to ‘evidence’ or support this claim, however, it was noted that if people wanted to report threats, they do not know who they can report to. Local police, and even local traditional and government leadership, are not necessarily trusted to act on such information, and are typically seen as part of a government structure seeking to suppress opposition.
It was also noted that the ESIA report states that there are no migratory fish species that would be affected by the construction of the dam. However, stakeholders disagree with this statement, noting that there are in fact migratory fish species that would be impacted detrimentally by the presence of a dam. The stakeholder has, therefore, questioned whether the specialist report was rushed or perhaps written under instruction/coercion. Put simply, it is likely the environmental impacts have not been made clear. We suspect the author was paid to minimize the harm we know to be likely as a result of this project.
“the review and comment period for the draft ESIAs will remain open until such time that the Authority and ERM are able to hold the ESIA disclosure meetings, or until further notice is given by the Authority and ERM. Your input remains key in the updating and finalization of the ESIA studies and stakeholders are encouraged to continue reviewing the draft ESIAs and to submit questions and comments to ERM: batokagorgehes@erm.com”
Stakeholders can access the draft ESIA reports and Non-Technical Summaries (NTSs) through the project website, www.erm.com/BGHES-ESIA and at the public locations previously communicated.”
Featured image: Brian McMorrow, CC BY-SA 2.5, via Wikimedia Commons
This episode of The Green Flame podcast focuses on the proposed Batoka Gorge Dam on the Zambezi River on the border of Zambia and Zimbabwe, just downstream from the world-famous Victoria Falls.
Max Wilbert interviews Monga, who has lived by the Zambezi River and is active in environmental issues and factors that impact on underprivilidged people in Zambia, and Marie-Louise Killet, a member of the group “Save the Zambezi River” which is opposing the Batoka Gorge project. The third guest is Rebecca Wildbear, a river and soul guide, who helps people tune into the mysteries of life and live with earth communities, dreams and their own wild nature.
The Green Flame is a Deep Green Resistance podcast offering revolutionary analysis, skill sharing, and inspiration for the movement to save the planet by any means necessary. Our hosts are Max Wilbert and Jennifer Murnan.
Support the Show
Like what you hear? Make it all possible by going to Deep Green Resistance and making a one time or monthly recurring contribution.
This piece was originally published in Earth Island Journal.
Zambia and Zimbabwe plan to move ahead with the $4 billion Batoka Gorge Dam that would displace villagers, wildlife, and a vibrant rafting industry along the Zambezi River.
More than 50 men traverse the steep, rocky gorge. They balance as many as three kayaks on their back each, along with other equipment for rafting companies offering trips in the Batoka Gorge. Sweat glistens on their skin; they earn a dollar for each kayak. These porters come from the Indigenous Tokaleya villages situated along the edge of the gorge, on either side of the Zambia-Zimbabwe border. For the Tokaleya, the Zambezi River is an essential and sacred deity. It’s also a source of income. Tens of thousands of tourists raft the Zambezi’s rapids each year, drawn to the region’s rich ecosystem. Alongside the Tokeleya, birds, fish, and other wildlife make their home in the gorge.
Yet the section of the river that runs through Batoka Gorge is threatened. In June 2019, the General Electric Company of the United States and the Power Construction Corporation of China signed a deal with the Zambian and Zimbabwean governments to build and finance the Batoka Gorge Dam. The danger from a massive hydroelectric project, which was first proposed nearly 70 years ago, has become urgent.
Africa’s fourth largest river, the Zambezi flows through six countries. The Batoka Gorge section begins at the bottom of Victoria Falls, the largest waterfall in the world, also called Mosi-oa-Tunya, or “The Smoke That Thunders.” A few miles from Livingstone, Zambia, massive roaring waters spill from the sky and turn clear green as the river races through steep, dark canyon walls down the 50-mile gorge. The river then meanders for another 200 miles until it reaches Lake Kariba, the world’s largest reservoir by volume and an example of what Batoka Gorge could become.
I am a river guide, and in October 2019, I embarked on a four-day trip down Batoka Gorge as part of a two-week river guide training. Most of our guides, Melvin Ndelelwa, James Linyando, and Emmanuel Ngenda, were from the Tokaleya villages. Ndelelwa, who was a porter before becoming a river guide, pulled out a picture of a fish he caught at a hidden pool below the falls. It was almost as big as he is. His father was a porter his whole life. Becoming a raft guide in Zambia is hard work. The possibility of learning to guide energizes the porters.
Ndelelwa explains how his younger brother carves ebony root to make Nyami Nyami necklaces. The Nyami Nyami is a mythic river god, a serpent with the head of a fish. Legend has it, this god is angry that his sweetheart is trapped downstream behind the giant Kariba Dam. In 1956, a year into construction, the Nyami Nyami flooded the river, wreaking havoc on the construction site. The odds of another flood in 1957 were a thousand to one. Yet the river rose three meters higher than before, destroying the bridge, cofferdam, and parts of the main wall.
The guides told us that the Nyami Nyami would protect us when we wear the necklace that honors his sweetheart. On the river, I touched mine often, praying for safe passage. I am terrified of big water and scared of flipping. The Zambezi is a huge volume river with little exposed rock. It is extremely challenging, with long and powerful rapids, steep gradients, and big drops. Flipping is common. In high-pressure areas, you can’t even depend on your life jacket to keep your head above water.
On the river, I clung to the raft in awe and terror at the size of the waves. October is the dry season, when the water is low. In December, the rains raise the river and turn it muddy brown. Linyando navigated ahead in a safety kayak while Ngenda captained our raft. At one point between rapids, he pointed out the camouflaged crocodiles sun-bathing on rocks.
Halfway through the training, I was invited to guide the most challenging rapid, Gulliver’s Travels. I had already guided the rapid just prior called Devil’s Toilet Bowl twice, but my angle was off on this third attempt. The raft flipped backwards. I went deep underwater. It was dark and silent. A shaft of light appeared. Then more light. I surfaced. We turned the boat upright, but my confidence was shaken. I thought of backing out of Gulliver’s Travels, until the guides encouraged me. Back in the boat, I sent the raft through.
Throughout the trip, I felt that the guides protected me. Ndelelwa offered his sandal for the steep hike out after I lost my shoe. “This is my home,” he said. “It’s easy for me to walk barefoot.” Later, when I encountered a puff adder — a venomous snake with a bite that can be deadly — near my sleeping bag, Ngenda helped me move closer to the fire. “We sleep here,” he said. “The snakes don’t like fire.” It smolders all night smoking fish for breakfast, a staple food in villages along the gorge.
IN 2015, THE WORLD BANK funded an Environmental and Social Impact Assessment (ESIA) that concluded that the dam is a “cheap” solution to the “electricity deficit” of Zambia and Zimbabwe. An airport and road have already been constructed. The reservoir of the 550-foot tall mega-dam will be 16 square miles and a half-mile from the put-in just below Victoria Falls, impacting a UNESCO World Heritage Site sacred to the Tokaleya peoples. The entire canyon will be drowned and destroyed.
If the dam build goes ahead, wildlife who live and breed in the gorge will be lost or displaced. The Cornish jack and bottlenose fish need fast-moving water to survive. The extremely rare Taita falcon is endemic to Batoka Gorge — it nests and breeds only here. The hooves of the small klipspringer antelope are designed to jump up and down the canyon. They will not be able to live on top. Leopards that live in the gorge will be forced to move to higher ground, becoming more vulnerable to hunting and poaching.
The ecological damage is layered with the human toll. Downstream from Batoka Gorge, the Kariba Dam, built in the late 1950s, displaced 57,000 Indigenous Gwembe Tonga and Kore Kore peoples, while stranding thousands of animals on islands. Kariba Dam has also demonstrated that imprisoning a river damages water quality, reduces the amount of water available for people and wildlife downstream, and harms the fertility of the land. Dams can also spread waterborne diseases such as malaria and schistosomiasis, while mega-dams may cause earthquakes and destructive floods.
Plus, the lifespan of a dam is 50 years. Less than 30 years after construction, Kariba Dam began falling apart, causing earthquakes and operating at less than 30 percent its proposed capacity. Falling water levels have made it increasingly less productive. The Chinese construction company regularly pours concrete into the wall to keep it from buckling. If it broke, it could cause a tsunami that would impact much of Mozambique and even Madagascar, potentially killing millions.
The Batoka Gorge project will cost around four billion dollars. It is supposed to take 10 to 13 years to complete, but some locals have noticed that high cost infrastructure projects often do not reach completion in Zambia. Increasing droughts due to climate change raise the question whether there will be enough water to operate a dam. Electricity generated is likely to be sold to foreign countries for income, while local people become poorer.
The dam will also displace river guides and most likely the villages along the gorge. Tourism is the third largest industry in Zambia. The governments say the dam’s construction will create jobs, but many of these jobs go to Chinese nationals hired by Chinese companies, and after construction ends, few will be needed to operate the dam. Some say the dam will create new tourism opportunities, like parasailing and wakeboarding, but crocodiles and hippos proliferate in flat water, making these activities risky.
China is rapidly expanding its global reach, including in Africa, through its Belt and Road Initiative, an ambitious infrastructure project extending to 60 countries and counting. The country has already financed two Zambian airports and the Itezhi Tezhi Dam, and owns a 60 percent share of Zambia national broadcasting service. As many less developed countries borrow big money from China for big infrastructure projects, they are incurring large debts. The debt incurred can be crushing to the food supplies, health services, and education of local people. As Daimone Siulapwa writes in the Zambian Observer, huge kickbacks are the root of the problem. They motivate Zambian leaders to negotiate deals with China. Millions of dollars go missing. Projects are not finished. The natural world and local people suffer.
Most river guides hope the dam never happens, but local rafting companies are afraid to speak out against it. They fear repercussions — from being shot to having their passport or business license revoked. International support is imperative if we want to see this river protected.
ALONG THE RIVER, villagers carve and sell wooden figurines: elephants, rhinos, lions, water buffalo. Ndelelwa always buys some, though he does not need them. I bought carvings too, and the vendor insisted on giving me a few extra.
Then Ndelelwa invited me to his village to eat nshima, a traditional thick maize porridge. We sat outside the round mud huts with grass roofs. Five children ran over to look at me with toothy smiles and a wide-eyed curiosity. As we ate from one bowl, I thanked them in their dialect, “Ndalumba.”
If the river is dammed, I wonder, what will happen to these people? How will they survive?
The last time I flipped the raft on the Zambezi, the waves were gentle. We held the perimeter rope of the capsized boat as we floated through a narrow section of canyon. Ngenda smiled as he turned the boat upright.
Dam projects are rarely stopped in industrial civilization. Save the Zambezi formed to oppose the construction of this dam. They seek help in challenging the ESIA. This dam will likely go ahead unless there is an unprecedented outcry of resistance. The Nyami Nyami protected us on the river. Perhaps his rage may once again knock down any walls placed in his path. I touch my necklace and pray for the river.
Contact Marie-Louise Kellett of Save the Zambezi, a Waterkeeper Alliance Affiliate, savethezam@gmail.com to get involved.
Rebecca Wildbear is a river and soul guide who helps people tune in to the mysteries that live within the Earth community, dreams, and their own wild Nature, so they may live a life of creative service. She has been a guide with Animas Valley Institute since 2006 and is the author of the forthcoming book Playing & Praying: Soul Stories to Inspire Personal & Planetary Transformation.
In this writing Ben asks questions about a rail development that is destroying the natural world. He asks what it would take to stop the development and why we are not all talking about it.
Is high speed rail the pinnacle of civilisations’ insanity?
Probably not, unfortunately, but it is an excellent example. Standing in the same place for centuries should mean something. The men must have made a mistake. They have destroyed a National Asset. The National Heritage has a list of criteria for granting protected status that includes being in the same place for centuries. Why have they just demolished a possible candidate for the National Heritage List for England? The answer is, it was a tree who was razed to the ground and not a building. The tree was in the way of “progress” and those who get in the way are often crushed.<
Imagine a country so insane it would spend £100 billion during a pandemic and one of the worst recessions in human history, just to speed up a journey by 20 minutes. That’s 5 billion a minute. Imagine the same project would destroy over 700 wildlife sites including sites designated by that same culture as Sites of Special Scientific Interest (SSI) and not be carbon ‘friendly’ for at least a hundred years.
Imagine it would simultaneously threaten the water supply of its biggest city and use between 6 and 10 million liters of water during its construction. Now imagine the same project has been made obsolete by a virus that has stopped people travelling for business. Of course you do not have to imagine it. The country is the UK and it is as insane as the culture it is part of Industrial civilisation.
High Speed Rail (HS2)
The first stage of HS2 will make the rail journey from the UK’s London to Birmingham 1200 seconds quicker. That is for people who can afford the tickets, which are likely to be in the region of £50. What are people going to do with these 20 minutes? If they were commuting there is probably little they can do at work that they could not have done on the train.
The rational arguments for HS2 do not exist. There are none. But the project will continue. Why? Because it has already started, too much money has been spent and too much embarrassment will be caused, if it stopped. For a culture that prides itself on its rationality, this is baffling. Even when the evidence is so strong, it is hard to accept that our own culture is insane.
Right now there are brave people occupying woods and sleeping in tree houses attempting to slow down the HS2 project and the pointless destruction it is causing. Their efforts are courageous and valuable. Their resistance probably won’t stop HS2, but their actions will not be in vain because the morality of what they are doing is clear for all beings who care to learn about it.
What would it take to stop HS2?
The people in the camps are above ground and peaceful. But what if there was another, completely separate, group of militant underground activists using the hit and run tactics of successful resistance groups? Would sabotage stop HS2? Would sand or water or bleach in the engines of their destructive machines stop them? Would constant, relentless physical intimidation of the workers make the project impossible to complete?
What would a truly effective campaign look like and why are we not talking about it?
Ben Warner is a longtime guardian with DGR, a teacher, and an activist.
Featured image artist unknown via Stop HS2 campaign. There are suggestions of how you can help resist the destruction on their website: stophs2.org.
The Ohio River is the most polluted river in the United States. In this series of essays entitled ‘The Ohio River Speaks,‘ Will Falk travels the length of the river and tells her story. Read the first, second, third, fourth and fifth part of Will’s journey.
The Kinzua Dam forms the Allegheny Reservoir, a few miles east of Warren, PA. Two days before the Fourth of July, I studied the dam and reservoir from a parking lot built on the southern edge of the dam. I was angry. Below me, motorboats and jet skis ripped across the water. Classic rock and pop country playlists clashed as parties raged on pontoon boats. Behind me, motorcycles carrying humans on holiday rides tore down the highway. The noise foreshadowed the fireworks that would soon light up the nation. Hearing the exploding fuel in combustion engines racing around me, and imagining the fireworks’ gunpowder that would soon be exploding across the sky, I wondered why my fellow Americans blow so much shit up when they celebrate.
The star-spangled banner flying over a Seneca Nation flag on a pole above me caused me to consider whether Americans actually believe fireworks put on a better show than the setting sun or whether fireworks are so beloved because they remind Americans of “the rocket’s red glare, the bombs bursting in air” and their favorite pastime, colonial warfare.
The anger grew as I studied the 1900 feet of concrete, steel, gravel, and dirt that stretches between two hills and stands 179 feet tall to trap the Ohio River.
I scanned the Allegheny Reservoir until it disappeared behind more hills. I knew, from previous research, that the Allegheny Reservoir sprawled northwards into southern New York for 27 miles and reached depths of 120 feet. I knew, too, that Seneca land had been destroyed when the reservoir was formed. Meanwhile, the sounds of Styx – that river in Hell and an accursedly annoying rock band – playing “Come Sail Away” competed with Shania Twain’s “That Don’t Impress Me Much.” Singalongs and drunken laughter, amplified by the water, drifted up to me. Shania’s mood matched mine best. I asked the Ohio River how anyone could party in the midst of such destruction.
Eventually the boats turned a corner formed by the hills and vanished. The wind blew across the Allegheny Reservoir leaving a delicate wake. The reflection of the hills in the water danced and waved. The water enchanted me. I tried to picture what was under the water. And, that’s when the Ohio River’s answer came to me.
People can party in the midst of this destruction, they can drive their jet skis over indigenous burial grounds, they can dance on pontoon boats floating over stolen land because so much truth, today, is submerged. Truth is submerged by history. Truth is submerged by ideology and cultural conditioning. Truth is submerged by popular ignorance of the processes destroying the planet. Truth is literally submerged like Seneca land under the Allegheny Reservoir.
The history of the Kinzua Dam and Allegheny Reservoir submerges many truths.
These truths include theft of Native land, the forcible removal of Native people, and another treaty to add to the long list of broken promises the federal government has made to Native Americans. In 1936, the infamous St. Patrick’s Day Flood washed over the Ohio River Basin. Floods like the St. Patrick’s Day Flood had, for years, directly threatened Pittsburgh, one of America’s most important industrial cities at the time. Instead of considering whether it was prudent to allow massive human populations to congregate in areas prone to powerful floods, Congress responded with the Flood Control Acts of 1936 and 1938 and authorized the Kinzua Dam.
The completion of the Kinzua Dam in 1965 and the formation of the Allegheny Reservoir drowned 10,000 acres of the Seneca Nation’s most fertile lands. That 10,000 acres represented one third of the territory promised to the Seneca under the 1794 Treaty of Canandaigua signed by George Washington himself. The formation of the dam also required the removal of around 600 Senecas from their ancestral homelands.
Living Senecas were removed. And, so were some of the Seneca dead. In 1964, in an act of utter disrespect, the United States Army Corps of Engineers attempted to dig up the remains of one of the most famous Seneca war chiefs, Cornplanter, as well as the remains of more than 300 of his kin and descendants. If that wasn’t bad enough, apparently the Corps of Engineers did such a questionable job, that many Seneca wonder whether Cornplanter was ever truly moved and whether his resting place has been drowned by reservoir.
Truths are also submerged in plain sight by an ignorance of the industrial processes necessary to construct the Kinzua Dam.
Concrete is a good example. Despite being surrounded by concrete, I had never asked where concrete comes from. It turns out that concrete is one of the most destructive materials on earth. Using a study published by the Proceedings of the National Academy of Sciences, a Guardian article I found estimated that concrete now outweighs the combined carbon mass of every tree, bush, and shrub on the planet. In simpler terms, there may be more concrete on Earth than plants.
According to London’s Royal Institute of International Affairs, the production of cement – a key ingredient in concrete – is responsible for 8 percent of global carbon dioxide emissions. And, perhaps most pertinent to the Ohio River, concrete sucks up almost a 10th of the world’s industrial water use. But, how is concrete made? It starts with ripping limestone, clay, sand, and other aggregates from the earth. Wild beings live in communities where this limestone, clay, and sand is ripped from the earth. So, this extraction destroys these beings’ homes. Extracting and transporting these materials requires industrial energy and produces dust pollution as well as greenhouse gas emissions.
Industrial energy production involves ripping fossil fuels from the earth, produces toxic waste, and also destroys habitat.
The limestone, clay, sand, and other aggregates must be crushed and mixed with water to a certain proportion. This crushing and mixing process also requires industrial energy, produces emissions, and consumes water. The mixture is then heated to around 2700 degrees Fahrenheit to decompose the limestone and produce what is called “clinker.” This heating process again requires industrial energy, produces emissions from the burning of fossil fuels, emissions from the burning of the aggregates, and hazardous waste. After the clinker is created, it is quickly cooled and ground up. The rapid cooling process requires industrial energy and the grinding process produces dust pollution.
The ground clinker is now dry cement which is bagged, shipped, and distributed to work sites. Bagging produces waste and involves paper production which requires deforestation. Shipping and distribution require energy for transportation which again produces emissions. Finally, the dry cement is mixed with potable water and another type of extracted aggregate including quarried stone, fly ash, slag, and sometimes recycled concrete. In other words, when I looked at the Kinzua Dam’s concrete, I was looking at a destructive process involving thousands of people engaged in dozens of ecocidal activities that produced all kinds of pollutants and consumed water, the most precious necessity of life.
After I learned how concrete was made, when I looked at the Kinzua Dam, I couldn’t help but see the gaping wounds quarries cut into the land, the lungs microscopically shredded by tiny rock fragments in dust pollution, and the water stolen from creeks, streams, and rivers only to be trapped for centuries in blocks of concrete.
Uncovering these submerged truths made me angrier.
I fantasized about sinking pontoon boats, pouring sugar in jet ski gas tanks, and slashing motorcycle tires. I fantasized about the ghost of Cornplanter drilling holes in the Kinzua Dam. I fantasized about the Ohio River gathering her power to overwhelm and destroy the dam.
While I pictured the Ohio River bursting through the Kinzua Dam, I noticed a sound my ears had not picked up before. So far, I had only viewed the dam from the east side, the side trapping the river. This new sound beckoned me to view the dam from the west. As I moved westward, I heard a growing roar. Then, on the dam’s west side, I saw the Ohio River gushing out of two floodgates. The sound was roughly similar to the sound a waterfall makes. But, it was not the same.
Rivers choose to leap from waterfalls. They shout with joy as they jump from cliffs and over stones. They thunder while proudly showing off the full power of their flow. At the Kinzua Dam, the Ohio River was not free to choose. She was forcibly squeezed through pipes called penstocks to turn hydroelectric generating turbines. Then, she was shoved from a ledge to slam into a concrete drainage control bed.
As I listened, I knew the Ohio River was screaming with anger. The hills rang with her rage. In this rage, I heard her explain how I could put the anger I was feeling to good use. She told me to dive into the depths and give voice to submerged truths.